PMV contractor assignment error

Resolve contractor Planned maintenance visits cost errors by setting the visit rates

R
Written by Rubin Muresan
Updated this week

This error appears when trying to assign a contractor to a PMV contract that has been configured to use the same cost across all sites, but no cost has yet been entered. Without a cost, the system cannot proceed with the assignment.

'You cannot assign a contractor to this until you have entered their costs using Edit contractors.'

To resolve this, you need to enter a cost against the contractorโ€™s PMV contract:

  1. From the Admin, click Add/Edit Contractors.

  2. Select the contractor and open the Rates tab.

  3. Click the Planned tab at the top.

  4. Unlock the green padlock icon.

  5. From the dropdown, select the PMV contract name.

  6. Enter the cost for the contract.

  7. Click Save.

๐Ÿ“Œ Note: This cost will be automatically applied to all sites linked to the contract.